Fit for maximum performance: Inspection and maintenance

EnergieLink provides a full range of revision services and both servicing and maintenance for industrial plants throughout Europe. These range from revision of the firing system and flue gas cleaning to a complete overhaul, including the organisation and coordination of all subcontractors. We strive to minimise downtimes as much as possible and ensure a high degree of availability.

Our experienced employees undergo regular training to ensure that they are fully up-to-date as regards plant engineering and health and safety. This enables us to advise you on energy efficiency and optimising potential. Our preferred approach is to work closely with regional partners throughout Europe, as this enhances efficiency and reduces costs.

Inspection: Dampers

Task

Butterfly and gate dampers are elementary components of modern industrial plants, being employed for the discharge and redirection of air, gas or flue gas. They are powered by a variety of drive systems, depending on the application involved. It is important to select the right technical and economic solution for your requirements.

Solution

The takeover of Steinberg + Kirsch®, a market leader in the development and production of quality butterfly and gate valves in Europe, means that we are not only able to supply these products but also install, inspect and maintain them at a highly qualified level.

Implementation

The combination of Steinberg + Kirsch® know-how regarding butterfly and gate valves and EnergieLink’s expertise in power stations and waste incineration plants creates an extremely interesting symbiosis of product competence and plant experience. This means that we can offer our customers butterfly and gate valves and associated services at all stages of the process from a single source.

We will be more than happy to provide you with advice.

Detailed: Planning revisions

Task

Revisions need to be planned and well thought out to avoid any unnecessary plant stoppages during the year as well as unnecessarily long downtimes during overhauls. Every day of production counts.

Solution

The individuality of our customers is matched by our versatility at EnergieLink. The necessary know-how and access to the required tools and equipment are our strengths when it comes to well-considered and clever planning.

Implementation

You can rely on our expertise, experience and specialists for support during every detail of planning, or we can take charge of all the planning, including coordination of all suppliers. We have made it our goal to support our customers in every situation and with every target to ensure that downtimes are always kept to a minimum.

Place your faith in our proven know-how!

Precision: Boiler revision

Task

Steam generator components require periodic revision, involving the measurement and documentation of the wall thickness of the various boiler pipes.  Layer thickness is measured in the case of pipes with a wear protection coating. The aim is to forecast the anticipated service life of diverse boiler components.

Solution

EnergieLink has trained personnel who specialise in boiler and cladding measurements. The measuring instruments we employ are subject to periodic inspection, as stipulated in ISO 9001.

Implementation

We have optimised the measurement process and selected the necessary tools to ensure that technically and economically efficient measurement is possible. We can identify the critical points in your boiler during measurement and document these in a measurement report.

You’re sure to appreciate our expertise!

Evident: Revisions

Task

The significance of revisionss and downtimes is growing, as they are associated with expense – be this in the form of sales losses or lengthy involvement of external companies. The quality and safety of the work carried out should not be neglected.

Solution

Trust and the availability of trained and qualified personnel are indispensable when it comes to work involved in an overhaul if scheduling, deadlines and quality targets are to be met.  EnergieLink always assigns highly trained personnel with the right tools and necessary protective equipment to these tasks.

Implementation

Our welders, fitters and installation technicians receive instruction and training throughout the year to ensure that procedures, processes and safety are optimised and observed. You can rely on our skilled specialists, as they invest enormous expertise and know-how on your behalf.

Efficient: Overhauling the firing system

Task

The hopper, grate and deslagger are key components exposed to a high thermal load. These elements of the process should be inspected and overhauled annually. An unscheduled downtime also offers an opportunity to conduct inspections of this nature and, if necessary, overhaul plant.

Solution

Professionalism, speed and quality at attractive prices. Overhauls are our absolute core competency, which is why we at EnergieLink are among the best in the business in this area.

Implementation

Try us out. Our experienced, trained personnel will whip your plant into shape. We can provide spare parts from the workbench or ex stock if necessary. We are well organised and, as a consequence, can also respond rapidly should you require our assistance.

Agile: 12 and 24-hour service

Task

Rather than being conducted according to a fixed schedule, plant overhauls and associated downtimes are increasingly conducted following the maximum uninterrupted operating period of the boiler. This results in service companies being required to react quicker and with more agility to the needs of customers.

Solution

Service providers like us at EnergieLink also need to organise deployment and operating times flexibly and at short notice to suit customers, while still maintaining quality and quantity levels. Trust and accessibility are important factors here.

Implemetation

With our own dedicated installation teams and through selected partners, we can guarantee an on-site response from a specialist within 12 hours and the assignment of an installation team within 24 hours. Simply call us, and we’ll be right there.

Forward-looking: Multi-year contracts

Task

Waste-to-energy plants require periodic inspection and overhaul. The service lives of individual components depend on the manner in which each plant is operated. The firing system in particular is subject to enormous thermal and mechanical loads. In addition, overhauls need to adhere to a predetermined budget and be able to be scheduled.

Solution

Service contracts make it possible to record this plant-specific wear process. Maintenance of a plant over several years allows problem zones to be determined. This means that critical components can be identified early and replaced, and means other components are not replaced unnecessarily.

Implementation

At EnergieLink we offer multi-year contracts at attractive hourly rates. Some plant operators are already benefiting from this service. Work for the next downtime is specified straight after each firing overhaul. This process is the result of close coordination with the customer. Please contact us if you would like to learn more about our service contracts.

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.